Another heat pump installation completed with a clean, professional result.
For this project, a reinforced concrete base was built to ensure greater stability, safety and correct levelling of the equipment.
Due to the existing technical space — a buried enclosure with very limited room for the circulation pump and filter — it was necessary to adapt the installation and create an external by-pass alongside the heat pump. This solution allows for better water flow management, facilitates future technical interventions and contributes to a more balanced and efficient system operation.
An external cover was also fitted to help preserve the equipment when not in use, reducing direct exposure to sun, dust, leaves and other debris.
A technical solution adapted to the real conditions on site, with a focus on efficiency, durability and quality of finish.