Full pool renovation

For this intervention, we carried out a full pool renovation, from the initial inspection through to the final finish.

We began with a hydraulic test and diving inspection, to assess the pool’s hydraulic system and check for any leaks before work commenced.

We then removed the old lining, eliminated the existing adhesive and prepared the pool back to the concrete. The base was levelled, washed and waterproofed before the application of the new Ervinel finish.

After grouting and the final clean, the pool was left renovated, fully functional and with a careful finish.